1. The mowing is scheduled to begin this month. Mowing will be performed 3 times per month through the month of October. We have asked the landscaper to mow in front of the cemetery once per month for the safety of our residents to ensure visibility when exiting the neighborhood.
2. We are having the irrigation systems checked at both entrances to be ready for watering once the rains subside.
3. We are having a contractor clear dead branches at both entrances and the Silverton Park as weather permits.
Comments